Civil Engineering

Civil Engineering > our team

Our Team

Glenn Cherrie
Managing Director

Glenn (top) joined Ward Group in 1977 after graduating from UNSW with a degree in civil engineering. In 1980 he was appointed Sydney Manager responsible for all the company's field operations and in 1986 he was appointed as Director of Construction. In 1988 Glenn was appointed as Managing Director, the position that he still holds today.
 
Glenn has also had a lengthy association with the Civil Contractors Federation. He held the position of National Board member from 1991 - 2001, serving as National President from 1995 to 1998. He also held the position of NSW Branch President from 2002 to 2007 and currently is a Board member of the NSW Branch. In 2008 he was awarded life membership of the Civil Contractors Federation.

Bob Stoddard
Director

Bob (bottom left) joined the Company in 1985 as a Project Administrator and progressed through Project Management to Director.  Bob has managed several significant projects for the Company including Ward's works in the restoration of Circular Quay.  He was instrumental in developing the Company's original Business Management System and is responsible for Ward Group's Industrial Relations.

Steve Green
Director, Construction

Steve (bottom right) recommenced with Ward in 1996 after earlier completing a Civil Engineering degree whilst working with Ward Group from 1987 through to 1991. During his time away from the company (1991 to 1995) he gained experience with both Tier 1 and small civil contractors working on a variety of road, bridge, communications and marine projects. Working as Project Manager from 1996 through to 2000, Steve was then made Construction Manager which is a role he still holds today.

During this time Steve has worked on all Ward Civil projects ranging from bulk excavations, shoring, detail excavation, marine, tunnels, concrete works, roadworks, bridges, airport pavements and other miscellaneous work. On these projects support and advice is provided to Project Managers, Project Engineers and Field Supervisors whilst liasing with clients to ensure their requirements are being met. Steve is also responsible for staff recruitment, Ward Plant, assisting with tender reviews and all matters pertaining on sites for safety, environmental and quality.

Wayne Wilson
Director, Estimating

Wayne commenced with Ward as an estimator in 1986 after 15 years construction experience in roadworks, mining, concreting and the asphalt industry. In 1997 Wayne was appointed Associate Director and joined the Board as a Director in 2003. Wayne is responsible for Estimating and Marketing.

Scott Fraser
Associate Director, Estimating

Scott joined the company in 1996 as a Project Engineer. Scott has 16 years experience in the project management and engineering of civil, infrastructure and remediation sites.  He has undertaken some of our more challenging projects including the Scot’s Church Project through which the company was awarded first place in the National Earth Awards for Construction Excellence. Scott’s strong background in project management allows him to now oversee our larger projects including the Boral Quarry Redevelopment at Greystanes. 

Paul Cramsie
Associate Director, Finance

Paul has been with the company since 2001.