Airport Drains D&C
The works comprise of the demoilition and reconstruction of apron pavement drainage adjacent to the Qantas Terminal at Sydney Airport. All works were undertaken during night curfew hours between 11.00pm and 5.00am.
The scope of work includes:
- Demolition of top section of drain and repair walls as required.
- Preparation of walls for placement of new dowelled precast drain sections.
- Place and grout precast top drain sections which include cast-in grate detail.
- Repair and rebuild associated drainage sumps and access covers.
| Client Name | Sydney Airports Corporation Limited |
| Location | Kingsford Smith Airport |