Lane Cove Tunnel - Stage 2, Epping Road
Construction works for the cycle way at 3 locations along Epping Road after the completition of the Lane Cove Tunnel.
The scope of work includes:
- Construction of cut and cover tunnel beneath the on-ramp from the Pacific Highway to Epping Road.
- Pile foundations.
- Shoring piles.
- Construction of concrete structures including bridge abutments and retaining walls.
- Construction of bridge deck, including installation of precast bridge planks.
- Tunnelling.
- Maintaining existing on-ramp for traffic flows.
- Associated architectural finishes.
- Installation of precast panels and floor beams to widen the existing footpath.
- Constructions of reinforce concrete footings.
- Construction of concrete retaining walls.
- Supply and installation of precast retaining walls.
| Client Name | Thiess John Holland Joint Venture |
| Location | Epping Road, Lane Cove |