Minchinbury Elevated Reservoir
The construction of a new 4ML elevated reservoir was required at Sydney Water’s Minchinbury Reservoir site to feed local industrial developments.
The scope of work includes:
- The excavation and construction of the foundation for the 32m high tower.
- The excavation and construction of a new Pump Station Building (including reinforced concrete slab and walls, structural steel, block work, brick work, roof, doors, eaves and ceiling).
- Road works providing permanent access to the new assets.
- Backfilling of all structures.
- Stormwater Drainage.
- Landscaping.
| Client Name | Saunders International Pty Ltd |
| Location | Wonderland Drive, Minchinbury |