Projects

Civil Engineering > Projects > Minchinbury Elevated Reservoir


Minchinbury Elevated Reservoir

 

The construction of a new 4ML elevated reservoir was required at Sydney Water’s Minchinbury Reservoir site to feed local industrial developments.

 

The scope of work includes:

 

- The excavation and construction of the foundation for the 32m high tower.

- The excavation and construction of a new Pump Station Building (including reinforced concrete slab and walls, structural steel, block work, brick work, roof, doors, eaves and ceiling).

- Road works providing permanent access to the new assets.

- Backfilling of all structures.

- Stormwater Drainage.

- Landscaping.

 

 

Client Name Saunders International Pty Ltd
Location Wonderland Drive, Minchinbury