- Civil Engineering
- Environmental Engineering
- Ground Engineering
- Post Tensioning
- Employee Access
- Career Opportunities
Rosehill Plant Upgrade
Construction of structural elements including associated works within an existing asphalt plant.
The scope of work includes:
- Demolition of existing aggregate bunkers, tunnel, conveyor systems and asphalt storing silos.
- Bulk and detail excavation.
- Concrete foundations for new structures.
- Construction of reinforced concrete walls.
- Sedimentation and erosion control.
- Stormwater drainage.
| Client Name | Downer Edi Works Pty Ltd |
| Location | 1 Unwin Street, Roseshill NSW 2142 |