Seawall Repairs - SOPA Contract Cap 196
The site was divided into three principle areas along 1,550m of seawall. The work site generally was an area from the top of the bank to the foreshore pathway or a distance of 10m.
The scope of work includes:
- Installation and maintenance of environmental protection measures including sediment fences.
- Reinstatement of seawall, 265m of hand packed Ballast, 350m machine placed armour (4,500 Tonne of imported selected rock).
- Protection and reinstatement of landscaped areas.
| Client Name | Sydney Olympic Park Authority |
| Location | Sydney Olympic Park |