- Civil Engineering
- Environmental Engineering
- Ground Engineering
- Post Tensioning
- Employee Access
- Career Opportunities
Taxiway Alpha & Golf Reconstruction
Airside works within existing Sydney Airport. Part of the works were undertaken during airport curfew hours of 11.00pm - 5.00am.
The scope of work includes:
- Reconstruction of existing taxiway pavements.
- Installation of 500mm of blended blast furnace slag.
- Placement of 100mm of asphalt.
- Installation of geogrid interlayer.
- Pavement airfield lighting.
- Linemarking.
| Client Name | Sydney Airports Corporation Limited |
| Location | Sydney Airport, Mascot NSW |