The works comprise of the excavation and reconstruction of the centrally trafficked pavements of Taxiway Foxtrot both east & west of Runway 16R/34L at Sydney Airport. All works were undertaken during night curfew hours between 11.00pm and 5.00am.

 

The scope of work includes:

 

- Profile existing asphaltic surface to 300mm below FSL.

- Excavate to 600mm below FSL.

- Place 2x250mm layers of 6% & 2% stabilment BBFS (Blended Blast Furnace Slag).

- Finish pavement with 100mm thick BC14 asphalt.

- Install airfield lighting and reinstate pavement markings to reconstructed taxiway.

 

 

Client Name Sydney Airports Corporation Limited
Location North South Runway Mascot