Vopak

 

The work involved the civil works associated with expansion of the Vopak Terminal at Botany.

 

The scope of work includes:

 

- Bulk excavation.

- Subgrade replacement of unsuitable ground.

- Construction of DGB20 ring beams.

- Installation of HDPE Liner waterproofing membrane.

- Construction of 900mm and 3000mm high concrete bund walls including Waterstop and joint sealing.

- Placing 200mm layer of 20-40mm aggregate.

 

 

Client Name CBI
Location Friendship Road, Port Botany