A selection of our Current Environmental Projects is listed below
Riverwood Residential Renewal
| Client Name | NSW Housing |
| Location | Washington Avenue, Riverwood |
| Type of Works | Remediation |
| Description |
Management of Asbestos Contamination, Earthworks, Storm Water Drainage and Roadworks.
|
Dawes Point East
| Client Name | Sydney Harbour Foreshore Authority |
| Location | Hickson Road, Dawes Point |
| Type of Works | Remediation |
| Description |
Excavation & removal; of impacted material, reinstatement with VENM, topsoil & turfing.
|
Rotary Park
| Client Name | Canterbury City Council |
| Location | Belmore Road, Riverwood NSW |
| Type of Works | Remediation |
| Description |
The Contract involves the remediation of open space land at Rotary Park, Belmore Road North, Riverwood. The Remediation works includes;
- Demolition and disposal of existing picnic tables and shelters - Removal of fencing within the eastern portion of Rotary Park - Relocation and stockpiling of existing sandstone and marble blocks within the site - Excavation and stockpiling of any portions of the access road, turning bay, and lead impacted materials - Stripping, stockpiling of asbestos contaminated fill and transportation and tipping of excess asbestos contaminated materials - Hand excavation within a 5m radius tree protection zone - Excavation of underlying natural clays and stockpiling for use as VENM capping material and covering - Rehabilitation of the existing creek - Augmentation of the existing swale and pipes drainage in eastern end of the site - Placement of clean top soil and drainage materials over the capping in areas - Trimming and restoration of adjacent areas to suit the new work - All areas disturbed in the undertaking of works topdressed and turfed using kikuyu grass. |
Stockland Glenrose
| Client Name | Stockland |
| Location | Glen Street, Belrose NSW |
| Type of Works | Demolition and Remediation |
| Description | Partial demolition of existing shopping centre building followed by controlled excavation and off site disposal of filling contaminated with volatile organic compounds (PCE / TCE). Additional works have included the relocation of storm water, electrical and fire services, structural cladding and support of remaining section of the shopping centre, environmental monitoring and site validation. |
Railcorp Awaba
| Client Name | Railcorp |
| Location | Awaba NSW |
| Type of Works | Excavation and Remediation |
| Description | Selective excavation and off site disposal of surface fill contaminated with transformer oils, site reinstatement and grassing. Works to be completed in a live rail corridor and in accordance with all requisite OHS&E requirements. |