SACL Perimeter Road, Stage 2

Project Name: Sydney Airport  – Perimeter Road, Stage 2

Client: SACL

Value: $5.3m

Location: Sydney Airport

Duration:  27 weeks

Commencement: 16 October 2017

Outline:

Ward has been contracted with the task of upgrading Perimeter Road. This is an airside project for SACL located alongside Ross Smith Avenue. It involves the construction of a new airside road, including the upgrade of the existing road.

Scope of Works:

  • Construction of airside road
  • Upgrade of existing road
  • Upgrade of existing 6no. DN750 culverts with class 10 pipe
  • Management of PFC impacted soils
  • Working around critical airport services including the Caltex high pressure fuel main, HV, airfield ground lighting  and APA ethane pipeline
  • Construction of a protection slab over the Caltex high pressure fuel main
  • Line marking and signage