Eastwood Brickworks Tip

Project name: Eastwood Brickworks Tip

Client: Austral Bricks Pty Ltd

Value: $7M

Location: 37 Midson Road, Eastwood

Commencement: January 2005

Duration: 48 weeks

Overview: This project involved the rehabilitation of the Eastwood Shale Quarry, which required 880,000m3 of VENM fill to be imported and placed in order for the site to be developed into a 260 lot residential subdivision.

Scope of works:

  • Sourcing appropriate fill materials to meet a stringent geotechnical and environmental specifications
  • Ensuring the minimum delivery requirements are met each month whilst abiding by constricted DA regulations
  • Excavating uncontrolled fill material; placing and compacting the approved materials until final design levels are reached
  • Controlling noise, dust and stormwater run-off in the pit as well as managing all safety aspects within the works area