Lane Cove Tunnel

Project name: Lane Cove Tunnel Stage 2 Epping Road

Client: Thiess John Holland Joint Venture

Value: $4M

Location: Epping Road, Lane Cove

Commencement: November 2007

Duration: 18 weeks

Overview: construction works for the cycle way at 3 locations along Epping Road after the completion of the Lane Cove Tunnel.

Scope of works:

  • Construction of cut and cover tunnel beneath the on-ramp from the Pacific Highway to Epping Road
  • Pile foundations and shoring piles
  • Construction of concrete structures including bridge abutments and reinforced concrete footings and concrete retaining walls
  • Construction of bridge deck, including installation of precast bridge planks and retaining walls
  • Maintaining existing on-ramp for traffic flows
  • Associated architectural finishes
  • Installation of precast panels and floor beams to widen the existing footpath