Project name: Riverwood Residential Civil and Landscaping
Client: Payce Consolidated
Value: $4M
Location: Washington Road, Riverwood
Commencement: September 2012
Duration: 40 weeks
Scope of works:
- Construction of new stormwater drainage and associated deep grass pollutant traps
- Removal and disposal of redundant drainage system and connection to existing
- Bulk earthworks, including cut to fill for road, footpath and public domain areas and testing in accordance with geotechnical requirements
- Construction of both reinforced and asphaltic concrete roads, footpaths and pedestrian areas with over 1,000m of associated kerb and gutter
- Construction of pedestrian foot bridge to adjoining wetlands area
- Hard landscaping works included over 1,500m2 of cobbled stoned paving, granite steps and dimensioned sandstone retaining walls and bollards
- Construction of 150m of bio-retention drainage underlying a permeable paving system. We were responsible for site remediation including testing, monitoring and offsite disposal of over 4000t of asbestos impacted material in accordance with all legislation