SACL Terminal Safety Works

Project name: SACL Terminal Safety Works

Client: Sydney Airport

Value: $0.125M

Location: Domestic and International Terminals at Sydney Airport

Commencement: March 2017

Overview: Safety and traffic management upgrades were required by Sydney Airport due to the increasing traffic volumes within the departures area of the international and domestic terminal passenger drop off areas. The works included speed reductions, instillation of audible speed arrestors and traffic control signs along with variable message signs with speed radar capability to advise drivers of there actual speeds.

Scope of works:

  • Instillation of traffic management signs for traffic controllers
  • Setup of 3no. variable message boards with radar speed capability
  • Setup of light towers for improved visibility of kerbside features at drop off locations
  • Instillation of audible speed humps at areas of reduced speed
  • New speed signs for areas of speed reduction
  • Weekly maintenance of traffic control installation including re-fuelling of hired plant