Overview//

< BACK

In ‘a first’ in the Southern hemisphere for a cruise terminal, Ward has been engaged to provide a new onshore power system, which will reduce noise and local air emissions when cruise ships and bulk vessels are at berth, as well as aid the transition to a low carbon maritime supply chain.

Scope of Works//

  • Design and construct power station sea water cooling system
  • Design and construction of quay side energy chain system including earthing
  • Design and construct of electrical supply to the future power station and switching station
  • Design and construct onshore power station foundations and earthing

 