Overview//
< BACKIn ‘a first’ in the Southern hemisphere for a cruise terminal, Ward has been engaged to provide a new onshore power system, which will reduce noise and local air emissions when cruise ships and bulk vessels are at berth, as well as aid the transition to a low carbon maritime supply chain.
Scope of Works//
- Design and construct power station sea water cooling system
- Design and construction of quay side energy chain system including earthing
- Design and construct of electrical supply to the future power station and switching station
- Design and construct onshore power station foundations and earthing