Overview//

< BACK

Works by Ward will involve the construction of a Heavy Vehicle Enforcement Bay (HVEB) on Foreshore Road, Botany Bay, designed to capture all westbound heavy vehicle traffic travelling from Port Botany to General Holmes Drive and the M5 Motorway. The HVEB will be used to inspect heavy vehicles to ensure compliance with weight and load restrictions.

Scope of Works//

  • Construction of a permanent amenities building, including a static weighbridge
  • Construction of road pavements for HVEB, including auxiliary lanes
  • Installation of a fully integrated Weigh-In-Motion (WIM) weighbridge
  • Installation of new Intelligent Transport Systems (ITS) and Variable Message Signage (VMS)
  • Lighting installation

 

Ward acknowledges Traditional Owners of Country throughout Australia and recognises the continuing connections to lands, waters and communities. We pay our respect to Aboriginal and Torres Strait Islander cultures and to Elders past and present.

DESIGNED BY ZULU 8

WARD © 2026. All rights reserved.