Overview//

< BACK

The primary purpose of the project is to effectively divert and discharge stormwater (up to a maximum 1:100-year rain event) around the active KRRC landfill area and safely discharge into the downstream creek. This will result in a range of benefits including allowing landfilling in Western Valley, increasing overall landfill life by 10-years and meeting Environmental Protection License requirements by improving stormwater management on site.

Scope of Works//

  • Establishment and management of environmental controls for the project duration
  • Clearing and grubbing of approximately 2.5ha of bushland
  • 40,000m3 of bulk earthworks
  • 1,800m3 of gabion retaining structures
  • 250m of stormwater drainage
  • Construction of a water management basin and outlet structures along with the associated landscaping

Ward acknowledges Traditional Owners of Country throughout Australia and recognises the continuing connections to lands, waters and communities. We pay our respect to Aboriginal and Torres Strait Islander cultures and to Elders past and present.

DESIGNED BY ZULU 8

WARD © 2026. All rights reserved.