Overview//

< BACK

The project involved the construction of various structures at the NCIG Coal Export Terminal located on Kooragang Island.

Scope of Works//

  • Clean Out Stumps Stage 2AA
  • Clean Out Stumps Stage 2F
  • K9-K10 tie in civil works
  • Construction of reinforced concrete structures, tanks, foundations, slabs, and associated minor steel structures and rails
  • Detailed excavation and shoring in water charged ground, within a working coal loading facility
  • Construction of heavily reinforced concrete structures, both in-ground and above-ground
  • Installation of cast-in steel items and coal loader rails