Overview//

< BACK

The purpose of the PLR Enabling Works was to minimise disruption to the flow of traffic during the construction and operation of the Parramatta Light Rail, which is expected to open in 2023.  This was achieved through increasing the capacity of the surrounding roads by diverting south bound and north bound traffic from Church Street to O’Connell Street (north of Factory Street), creating additional capacity on the Victoria Road and O’Connell Street Intersection (south of Factory Street), and diverting west bound traffic from Macquarie Street to George Street in Parramatta CBD.

Scope of Works//

  • Traffic management and control
  • Construction of roads, footpaths, kerb and intersections
  • Concrete works
  • Utility services adjustments and relocations
  • Demolition and earthworks
  • Signage and line marking
  • Drainage modifications
  • Urban design and landscaping
  • TCS installation/modification
  • Protection of archaeological and historical sites
  • Removal of spoil and contamination