Overview//

< BACK

Ward was responsible for the reconstruction of roads and services surrounding Parramatta, to improve its capacity to function as a major transport interchange.

Scope of Works//

  • Demolition of existing structures
  • Bulk earthworks to prepare the site for construction
  • Construction of retaining walls to support the infrastructure
  • Installation of stormwater drainage, electrical, and water services to facilitate the operation of the interchange
  • Stage construction of permanent roads to maintain traffic flow during construction
  • Construction of concrete pavements to provide durable surfaces for vehicles and pedestrians
  • Temporary shoring to support excavation work
  • Brick paving to create attractive public spaces
  • Construction of permanent flexible pavements to accommodate various types of vehicles and traffic
  • Installation of traffic signals to manage the flow of vehicles and ensure safety