Overview//

< BACK

This project involved clearing, earthworks, piling and detailed excavation for the expansion of the existing Silverwater Correctional Facility.

Scope of Works//

  • Tree clearing and stump removal
  • Bulk earthworks cut to fill over 30,000m2 pad
  • Construction of piling platform
  • Design, supply and install >1,000No. precast piles
  • Stormwater drainage installation
  • Flexible pavement construction
  • Detailed excavation and backfilling for buildings