Overview//
< BACKThis project involved clearing, earthworks, piling and detailed excavation for the expansion of the existing Silverwater Correctional Facility.
Scope of Works//
- Tree clearing and stump removal
- Bulk earthworks cut to fill over 30,000m2 pad
- Construction of piling platform
- Design, supply and install >1,000No. precast piles
- Stormwater drainage installation
- Flexible pavement construction
- Detailed excavation and backfilling for buildings