Overview//

< BACK

Sydney Airport is upgrading the South West Apron Bays 71-77 from layover positions to serviced active bays, capable of bussed arrival and departures. To support active bay operations, the bay infrastructure at Bays 71 to 77 will be upgraded for refuelling capability, aircraft ground power and preconditioned air. In addition, the front of stand apron is to be modified to include a head of stand road.

Scope of Works//

  • Demolition of existing Pavements
  • Earthworks, subgrade preparation and trench excavation required for the construction of in-ground service infrastructure
  • Installation of Below Services & associated works:
    • Fuel Infrastructure
    • HV, LV Works
    • Communication, Lighting & CCTV works
    • Ground Power & Pre-conditioned Air
    • AGL
    • SCADA / PLC / AMS system
    • VDGS panels
  • Apron pavement replacement and reconstruction work, including new rigid pavement, and construction of tug-strength and high strength flexible pavements

 