Overview//

< BACK

WestConnex was Australia’s largest road infrastructure project, spanning 33km and linking Sydney’s west and south-west with the city, airport, and port. The project involved the removal of 140,000t of asbestos-contaminated material and 110,000t of general solid waste, reusable sands, plastics, and timber waste. As the Managing Contractor for the early works, Ward provided a cost-effective solution for the removal and demolition of structures, including a dilapidated weighbridge, sound wall, and concrete slabs. Ward also performed major land slip stabilisation works, preventing potential damage to adjoining properties.

Scope of Works//

  • Preparation and implementation of site management plan
  • Relocation of stockpiled material (including asbestos contaminated material) from the site to landfill and recycling facilities
  • Processing of materials on-site to create product for future site works
  • Construction of earth buttress to stabilise a landslip on the site boundary
  • Provision of emergency works on the site
  • Environmental and community management

Ward acknowledges Traditional Owners of Country throughout Australia and recognises the continuing connections to lands, waters and communities. We pay our respect to Aboriginal and Torres Strait Islander cultures and to Elders past and present.

DESIGNED BY ZULU 8

WARD © 2026. All rights reserved.