Overview//

< BACK

The project involved site preparation for a new residential development in Newcastle, undertaken as a joint venture between Mirvac and Landcom.

Scope of Works//

  • Bulk excavation and removal of 45,000m3 of sand, clay, and shale
  • Removal of contaminated materials, including asbestos-contaminated materials, restricted, and general solid waste
  • Installation of over 500 contiguous and soldier piles with capping beam
  • Installation of approximately 300 temporary anchors, including walers and shotcrete
  • Detailed excavation of crane base, lift pits and pad footings
  • Installation of 105 structural piles, including core piles
  • Temporary shoring to the existing site boundary