Overview//
< BACKBased on the latest Wilton Growth Projection report, the estimated number of actual connections (residential only) will be 2,853 by 2027 and 3,110 by 2028. Based on this forecast, it was recommended to have the Wilton drinking water reservoir commissioned by the end of the 2027 financial year, to accommodate the anticipated growth. WISP Package 4 includes the construction of an 8ML potable water and 1.7ML steel reservoir and supporting infrastructure.
Scope of Works//
- Construction of site access road and Picton Road modifications
- Bulk Earthworks, 25, 000m3 cut material
- Soil nails and shotcrete cut batter
- Supply and install potable and recycled watermains and scour and overflow pipework including construction of valve chambers
- Construction of 8ML potable water and 1.7ML recycled water steel reservoir including concrete foundation
- Steel reservoir structural steel access
- Construction of Endeavour energy electrical
- Supply and installation steel reservoir electrical instrumentation and apparatus
- Supply and installation of chlorine dosing double containment lines
- Construction of electrical switch room
- Civil works including pavements, stormwater, sediment basins, kerb and gutter, landscaping and perimeter fencing